Chapter

The Energy Question

AI vs. streaming footprints; per-use vs. aggregate framing; debunked figures; water, grid strain, local prices.

This is where the most confident numbers are also the least reliable. Per-use, a text prompt is trivial — smaller than a Google search plus a page load. In aggregate, the buildout is a genuine grid event. Both are true, and conflating them is how the debate goes wrong in either direction.

Reading path

In order. 4 pieces, mixed media.

  1. 01 · briefAI vs. Netflix and YouTube: Energy FootprintsInternal research brief · 2026-08-23
  2. 02 · widget

    Energy Comparator (dataset)

    Energy per use, kWh · log scale

    AI video clip, 5 sec*0.9 kWh

    AI vs. Streaming brief — the most contested figure in the set; generated video is orders of magnitude above text.

    Netflix / YouTube, 1 hr HD0.12 kWh

    Activity chart; IEA / Kamiya lineage.

    Zoom call, 1 hr0.049 kWh

    Activity chart.

    Very-long-input AI query (100k tokens)0.04 kWh

    Epoch AI, “How much energy does ChatGPT use?”, appendix. source

    Short email0.0133 kWh

    Activity chart.

    AI image, 1 image0.003 kWh

    Activity chart.

    Long-input AI query (10k tokens)0.0025 kWh

    Epoch AI, “How much energy does ChatGPT use?”, appendix. source

    Voice assistant query0.0005 kWh

    Activity chart.

    Google search or AI chatbot prompt0.0003 kWh

    Epoch AI, “How much energy does ChatGPT use?” source

    1 hour of Netflix ≈ 100–300 typical AI text prompts. * = contested estimate. Hover any bar for its citation.

    Open the dataset entry
  3. 03 · widget

    Midwest Site Map (dataset)

    Schematic — not to scale

    Mount Pleasant, WI

    · pop. ~27kOperational

    Microsoft Fairwater Wisconsin

    Proposed · Hyperscale campus on the failed Foxconn parcel; $19.7M in taxes on track for 2026.

    The fight · Largely defused: no NDA and 60+ public meetings. Backlash arrived only once the national story did.

    Key people: Alyssa Capozziello

    Open the dataset entry
  4. 04 · essayNo Data Centers in My Backyardjasmi.news · 2026-08-03

Entities in this chapter