The numbers

Data explorers

Two tools. The first answers “is my prompt the problem?” The second answers “what is actually being built, and where?”

Energy comparator

Energy per use, kWh · log scale

AI video clip, 5 sec*0.9 kWh

AI vs. Streaming brief — the most contested figure in the set; generated video is orders of magnitude above text.

Netflix / YouTube, 1 hr HD0.12 kWh

Activity chart; IEA / Kamiya lineage.

Zoom call, 1 hr0.049 kWh

Activity chart.

Very-long-input AI query (100k tokens)0.04 kWh

Epoch AI, “How much energy does ChatGPT use?”, appendix. source

Short email0.0133 kWh

Activity chart.

AI image, 1 image0.003 kWh

Activity chart.

Long-input AI query (10k tokens)0.0025 kWh

Epoch AI, “How much energy does ChatGPT use?”, appendix. source

Voice assistant query0.0005 kWh

Activity chart.

Google search or AI chatbot prompt0.0003 kWh

Epoch AI, “How much energy does ChatGPT use?” source

1 hour of Netflix ≈ 100–300 typical AI text prompts. * = contested estimate. Hover any bar for its citation.

Per-use and aggregate are different questions. One prompt is trivial — smaller than a search plus a page load. The buildout that serves billions of prompts is a real grid event. A figure that is right for one question is usually wrong for the other. Long-context and video workloads break the “a prompt is nothing” intuition: 8–3,000× a short prompt.

Site map

Four reporting sites in Wisconsin and Michigan, Loudoun County as the prologue, and a Bay Area card that says plainly what this corpus does not cover. Select a pin to swap the card.

Schematic — not to scale

Mount Pleasant, WI

· pop. ~27kOperational

Microsoft Fairwater Wisconsin

Proposed · Hyperscale campus on the failed Foxconn parcel; $19.7M in taxes on track for 2026.

The fight · Largely defused: no NDA and 60+ public meetings. Backlash arrived only once the national story did.

Today
446k H100-eq · 369 MW · $14.0B
Projected Q2 2028
4,528k H100-eq · 2,263 MW · $85.7B
Hardware
Nvidia B200
Cooling
Air-cooled condenser

The Foxconn site, reborn. $19.7M in taxes on track for 2026; no NDA and 60+ public meetings — the counterexample. Backlash arrived here only once the national story did.

Key people: Alyssa Capozziello

Buildout at a glance

$38B
capex per GW of IT power
2.1 yrs
typical build time, GW-scale site
71%
of global AI compute owned by 5 hyperscalers
+15.5
ECI/yr model capability growth since early 2024
7 mo
doubling time of world AI compute stock
$370B+
raised by frontier AI labs

Data: Epoch AI, CC-BY · snapshotted 2026-08-23, not live-fetched · epoch.ai/trends